MY SEARCH ENGINE

Friday, October 3, 2008

Mars Odyssey THEMIS Images: September 29 - October 3,, 2008

MARS ODYSSEY THEMIS IMAGES
September 29 - October 3, 2008

o Hebrus Vallis (Released 29 September 2008)
http://themis.asu.edu/zoom-20080929a

o Landslide (Released 30 September 2008)
http://themis.asu.edu/zoom-20080930a

o Faulting (Released 01 October 2008)
http://themis.asu.edu/zoom-20081001a

o Candor Chasma (Released 02 October 2008)
http://themis.asu.edu/zoom-20081002a

o Landslide (Released 03 October 2008)
http://themis.asu.edu/zoom-20081003a


All of the THEMIS images are archived here:

http://themis.asu.edu/latest.html

NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission
for NASA's Office of Space Science, Washington, D.C. The Thermal Emission
Imaging System (THEMIS) was developed by Arizona State University,
Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing.
The THEMIS investigation is led by Dr. Philip Christensen at Arizona State
University. Lockheed Martin Astronautics, Denver, is the prime contractor
for the Odyssey project, and developed and built the orbiter. Mission
operations are conducted jointly from Lockheed Martin and from JPL, a
division of the California Institute of Technology in Pasadena.

To remove yourself from this mailing, please go to http://www.kintera.org/TR.asp?a=bhKPJ7OGIcLKI7I&s=hrKWIYOBLdIIKXMHKrE&m=jtLQL6OOJfI2G

To remove yourself from all mailings from NASA Jet Propulsion Laboratory, please go to http://www.kintera.org/TR.asp?a=ekIVKgPSLfKRKhL&s=hrKWIYOBLdIIKXMHKrE&m=jtLQL6OOJfI2G

No comments: